     rx 6X   @ 8  X@ 2         *                                    Ђ  I. A. 1. a.(1)(a) i) a)                 1 .1  A. 1. a. 1) a)                                                                             X`	hp x (#%'0*,.8135@8:<H?A                    (	xX8xX 8"                     $ SECTION 01300

% SUBMITTALS


PART 1   GENERAL

   ? x 1.01   SECTION INCLUDES

   ?   ((                    A.   Submittal procedures.

   ?   ((                   B.   Shop drawings.

   ? (
  ((                   C.   Product data.

   ?  1.02   RELATED SECTIONS

   ? H  ((   A. H Section 01700 - Contract Closeout: Contract warranty andcloseout submittals.(#

   ?  1.03  SUBMITTAL PROCEDURES

   ? 0  ((   A. H Transmit each submittal with Architect/Engineer acceptedform.(#

   ?   ((   B. H Sequentially number the transmittal forms.  Resubmittalsto have original number with an alphabetic suffix.(#

   ?   ((   C. H Identify Project, Contractor, Subcontractor or supplier;pertinent Drawing sheet and detail number(s), andspecification Section number, as appropriate.(#

   ?    ((                   D.  H Apply Contractor's stamp, signed or initialled certifyingthat review, verification of Products required, fielddimensions, adjacent construction Work, and coordinationof information, is in accordance with the requirements ofthe Work and Contract Documents.(#

   ?   ((                   E.  H Provide space for Contractor and Architect/Engineer reviewstamps.(#

   ?    ((                   F.  H Revise and resubmit submittals as required, identify allchanges made since previous submittal.(#

   ? `" 1.04   SHOP DRAWINGS

   ? #  ((   A. H Submit in the form of one reproducible transparency andone opaque reproduction.(#

   ? H&  ((   B. H After review , reproduce and distribute in accordance withArticle on Procedures above and for Record Documentsdescribed in Section 01700 - Contract Closeout.(#

   h)         0*0*0*  ԌSection 01300  Page 2

   ?  1.05   PRODUCT DATA

   ?    ((   A. H Submit the number of copies which the Contractor requires,plus two copies which will be retained by theArchitect/Engineer.(#

   ? @  ((   B. H Mark each copy to identify applicable products, models,options, and other data.  Supplement manufacturers'standard data to provide information unique to thisProject.(#

   ? (
  ((   C. H After review, distribute in accordance with Article onProcedures above and provide copies for Record Documentsdescribed in Section 01700 - Contract Closeout.(#


# END OF SECTION