   @   ,h  @#| x           2         2                                    Ђ  I. A. 1. a.(1)(a) i) a)                 1 .1  A. 1. a. 1) a)                                                                             X`	hp x (#%'0*,.8135@8:<H?A                    (	xX8xX 8"                     $ SECTION 02222

% EXCAVATION


PART 1   GENERAL

   ? x 1.01   SECTION INCLUDES

   ?   ((                    A.   Excavation for site structures.

   ?  1.02   RELATED SECTIONS

   ? (
  ((   A. H Quality Control: Inspection of bearing surfaces.(#

   ?   ((                   B.   Section 02223 - Backfilling.

   ? H  ((                   C.  H Section 02225 - Trenching: Excavation for utilitytrenches.(#

   ?  1.03  FIELD MEASUREMENTS

   ? 0  ((   A. H Verify that survey benchmark and intended elevations forthe Work are as indicated.(#


PART 2   PRODUCTS

 ((       Not Used.


PART 3   EXECUTION

   ?  3.01   PREPARATION

   ? X  ((   A.  Identify required lines, levels, contours, and datum.

   ?   ((   B. H Identify known underground, above ground, and aerialutilities.  Stake and flag locations.(#

   ? @  ((   C. H Notify utility company to remove and relocate utilities.(#

   ?    ((                   D.  H Protect above and below grade utilities which are toremain.(#

   ? (#  ((                   E.  H Protect plant life, lawns, and other features remaining asa portion of final landscaping.(#

   ? %  ((                   F.  H Protect bench marks, existing structures, fences,sidewalks, paving, and curbs from excavation equipment andvehicular traffic.(#


   h)         0*0*0*  ԌSection 02222  Page 2

3.02  EXCAVATION

   ?    ((   A. H Underpin adjacent structures which may be damaged byexcavation work, including utilities and pipe chases.(#

   ? x  ((   B. H Excavate subsoil required to accommodate site structures,and construction operations.(#

   ?   ((   C. H Machine slope banks.(#


   ? (
  ((   D. H Excavation cut not to interfere with normal 45 degreebearing splay of foundation.(#

   ?   ((   E. H Grade top perimeter of excavation to prevent surface waterfrom draining into excavation.(#

   ?   ((   F.  Hand trim excavation.  Remove loose matter.

   ? h  ((                   G.  H Notify Architect/Engineer of unexpected subsurfaceconditions and discontinue affected Work in area untilnotified to resume work.(#

   ?   ((   H. H Correct unauthorized excavation at no extra cost to Owner.(#

   ?  3.03   FIELD QUALITY CONTROL

   ?   ((   A. H Field inspection will be performed under provisions ofGeneral Conditions.(#

   ?    ((   B.  Provide for visual inspection of bearing surfaces.

   ?  3.04   PROTECTION

   ?    ((   A. H Protect excavations by methods required to prevent cave-inor loose soil from falling into excavation.(#

   ? x  ((   B. H Protect bottom of excavations and soil adjacent to andbeneath foundation, from freezing.(#


# END OF SECTION