Methodist_1.jpg|Methodist Health System|Methodist Health System Oak Harbor Blvd Slidell, La                                             Use the "NEXT" or "PREV" buttons to review all slides
This facility is 11,800 s.f. and includes a 40 x 20 Board Room.
Methodist_1.jpg|Methodist Health System|Methodist Health System Oak Harbor Blvd Slidell, La
Dammon Engineering is proud to have provided all disciplines of architecture and engineering for the design of this state of the art facility.
Methodist_1.jpg|Methodist Health System|Methodist Health System Oak Harbor Blvd Slidell, La
Construction was completed in 2007 at a cost of approximately $1,600,000.