|
|
|
Dammon Engineering
designed the renovation of 14,000 s.f. for the St. Tammany Parish Health
Department, adding 4,500 s.f. of space for patient care facilities.
|
|
|
|
Dammon Engineering
designed a new nurses’ station and computer center for the Drug Treatment
Center at Northshore Regional Medical Center.
|
|
|
|
The VA Medical Center in
New Orleans engaged Dammon Engineering’s services for several projects at
their facility, including renovations to labs, patient rooms, dining
facilities, clinic treatment facilities and offices as well as new roof
systems, repairs to the building’s structure, boiler room modifications,
chillers and HVAC systems. We were
also pleased to provide the design for their new 6,000 s.f. ADP
facility. Dammon Engineering has
worked with the VA Medical Center in New Orleans throughout the years on
numerous system-specific issues, providing both full-service designs, as well
as discipline-specific designs as needed.
|
|
|
|
The VA Medical Center in
Biloxi contacted Dammon Engineering with their need for a new medical waste
incinerator facility. Dammon
Engineering provided design services for their new building, road, and
utility systems for the new 600 lb./hr. incinerator as well as the demolition
plan for the existing incinerator. We
also provided design for the cold storage units around the VA complex for
storage of red bag infectious waste.
|