Index of /BackUp/Tuesday/20260324-190025-447/backup/mnt/nfs/Jobs/DAMMON/ACI/ACI Repair Application Procedures
Name
Last modified
Size
Description
Parent Directory
-
trombe_walls_01.pdf
2025-08-15 15:06
212K
thermal_bridging_prevention_01.pdf
2025-08-15 15:06
177K
Vertical and Overhead Spall Repair by Hand Application.pdf
2025-08-15 15:06
2.1M
Surface Repair Using Form-and-Pump Techniques.pdf
2025-08-15 15:06
3.7M
Surface Repair Using Form-and-Pour Techniques.pdf
2025-08-15 15:06
3.6M
Structural Crack Repair by Epoxy Injection.pdf
2025-08-15 15:06
1.0M
Spall Repair of Horizontal Concrete Surfaces.pdf
2025-08-15 15:06
1.9M
Spall Repair by the Preplaced Aggregate Method.pdf
2025-08-15 15:06
2.6M
Spall Repair by Low-Presure Spraying.pdf
2025-08-15 15:06
1.7M
Slabjacking.pdf
2025-08-15 15:06
2.0M
Methacrylate Flood Coat.pdf
2025-08-15 15:06
816K
Leveling and Reprofiling of Vertical and Overhead Surfaces.pdf
2025-08-15 15:06
530K
Installation of Embedded Galvanic Anodes.pdf
2025-08-15 15:06
6.4M
Crack Repair by Gravity Feed with Resin.pdf
2025-08-15 15:06
1.3M
Concrete Repair by Shotcrete Application.pdf
2025-08-15 15:06
571K
Concrete Removal Using Hydrodemolition.pdf
2025-08-15 15:06
1.4M
Brief_Report_of_the_Relationship_Between_Rheometry_Measurements_and_Form-CRC_40.pdf
2025-08-15 15:06
51K
ACI_committee_sustainability.pdf
2025-08-15 15:06
1.3M
Apache/2.4.58 (Ubuntu) Server at dammonengineering.com Port 80