Index of /BackUp/CodeBooksNSpecs/last_snapshot/backup/mnt/nfs/Codebooks/- ACI Codes/ACI Education Bulletins
Name
Last modified
Size
Description
Parent Directory
-
Bulletin E2-00 Reinforcement for Concrete Materials and Applications.pdf
2025-08-12 10:19
7.5M
ACI 201.1R_08 Guide for Conducting A Visual Inspection of Concrete in Service.pdf
2025-08-12 10:19
2.7M
Bulletin E3-13.01 Cementitious Materials for Concrete.pdf
2025-08-12 10:19
2.3M
Adhesive Anchor Installer Workbook Chapter 4.pdf
2025-08-12 10:19
2.1M
RAP-11 Slab Jacking.pdf
2025-08-12 10:19
2.0M
RAP-8 INstallation of Embedded Galvanic Anodes.pdf
2025-08-12 10:19
1.8M
RAP-5 Surface Repair Using Form and Pump Techniques.pdf
2025-08-12 10:19
1.6M
RAP-4 Surface Repair Using Form and Pour Techniques.pdf
2025-08-12 10:19
1.6M
RAP-14 Concrete Removal Using Hydrodemolition.pdf
2025-08-12 10:19
1.4M
ACI 364.10T_14 Rehabilitation of Structure with Reinforcement Section Loss.pdf
2025-08-12 10:19
1.1M
RAP-13 Methacrylate Flood Coat.pdf
2025-08-12 10:19
816K
RAP-7 Spall Repair of Horizontal Concrete Surfaces.pdf
2025-08-12 10:19
763K
RAP-9 Spall Repair by the Preplaced Aggregate Method.pdf
2025-08-12 10:19
701K
Bulletin E1_07 Aggregates for Concrete.PDF
2025-08-12 10:19
665K
Adhesive Anchor Installation and Inspection.pdf
2025-08-12 10:19
634K
RAP-3 Spall Repair by Low Pressure Spraying.pdf
2025-08-12 10:19
573K
RAP-12 Concrete Repair by Shotcrete Application.pdf
2025-08-12 10:19
571K
Adhesive Anchor Installation Theory and Practice .pdf
2025-08-12 10:19
541K
RAP-10 Leveling and Reprofiling of Vertical and Overhead Surfaces.pdf
2025-08-12 10:19
530K
RAP-6 Vertical and Overhead Spall Repair by Hand Application.pdf
2025-08-12 10:19
506K
Why Slabs Curl.pdf
2025-08-12 10:19
494K
RAP-2 Crack Repair by Gravity Feed with Resin.pdf
2025-08-12 10:19
411K
Floor Opening in 2-Way Slabs.pdf
2025-08-12 10:19
388K
ReInforcement in 2-Way Slabs.pdf
2025-08-12 10:19
381K
Structural Crack Repair by Epoxy Injection Molding.pdf
2025-08-12 10:19
329K
RAP-1 Structural Crack Repair by Epoxy Injection.pdf
2025-08-12 10:19
329K
Adhesive Anchor Requirements.pdf
2025-08-12 10:19
292K
Example Problems 702.2 Interaction Diagram for Concrete Columns_2007-02-20.pdf
2025-08-12 10:19
280K
3021R_04 Ch3 Guide for Concrete Floor and Slab Construction.pdf
2025-08-12 10:19
255K
Curing Test Cylinders in Hot Weather.pdf
2025-08-12 10:19
240K
Structural Crack Repair Field Guide to Concrete Repair.pdf
2025-08-12 10:19
233K
Adhesive Anchor Building Code Requirements.pdf
2025-08-12 10:19
222K
Example Problems 702.1 Allowable stress design of RC masonry shear wall 2006-03-29.pdf
2025-08-12 10:19
199K
305R-10 CEU excerpt Guide to Hot Weather Concreting.pdf
2025-08-12 10:19
196K
Adhesive Anchor Effects of Environment.pdf
2025-08-12 10:19
193K
Bulletin E4-12 Chemical Admixtures for Concrete.pdf
2025-08-12 10:19
173K
Example Problems 702.3 Acceptance of concrete test results_2007-03-06.pdf
2025-08-12 10:19
151K
Apache/2.4.58 (Ubuntu) Server at dammonengineering.com Port 80